The following warnings occurred:
Warning [2] Creating default object from empty value - Line: 11 - File: inc/plugins/tapatalk.php PHP 7.4.33 (Linux)
File Line Function
/inc/plugins/tapatalk.php 11 errorHandler->error
/inc/class_plugins.php 38 require_once
/inc/init.php 233 pluginSystem->load
/global.php 18 require_once
/showthread.php 24 require_once
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 864 - File: showthread.php PHP 7.4.33 (Linux)
File Line Function
/showthread.php 864 errorHandler->error




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
WPC floor inspection
#1
Ground moisture content check
Check the moisture content of the ground, the water content tester can be used to measure the ground moisture content, the standard requirements of ordinary ground 20%,Hot Sale Recyclable WPC Floor laying the floor requirements of geothermal 10%. If the ground moisture content is too high, the floor is easy to water swelling, resulting in the floor from the arch, from the drum, sound and other issues, so if the ground moisture content exceeds the standard value, to dehumidification.
Check whether the ground is strong
Then, is to see whether the ground is strong, you can use a screwdriver handle or hammer hit the ground, check the ground is empty,weather resist wpc wooden prefab house peeling off. If the ground is empty or flaking, you need to re-handle the ground. Otherwise, after laying the floor for some time, because the ground is not solid, it will sound.
Whether to do waterproofing measures
Then, to see if there is no waterproof measures, because the floor afraid of water intrusion, water invasion after the floor will be blistering, degumming,composite garden decking discount deformation and other series of problems, resulting in unusable. So before the pavement to check whether the waterproof measures are done, whether there is leakage of the house, if there should be processed and then paved the floor.
Floor construction and other construction staggered
Finally, to determine the construction time of the wooden floor, the general floor decoration and other construction staggered, the floor pavement should be hidden in the ground works, ceiling works, wall works, hydropower projects completed and acceptance,Eco Friendly Easily Assembled WPC Floor cross-operation is likely to cause damage to the floor, Such as the wall works are not completed, gravel fall will cause ash, scratches the floor and other issues, paint, paint spilled on the floor damage to the wooden floor beauty and so on, we need to pay attention.
Reply


Messages In This Thread
WPC floor inspection - qizhenapp - 09-05-2017, 01:09 AM
RE: WPC floor inspection - vyndr2 - 11-02-2020, 05:48 PM
RE: WPC floor inspection - vyndr2 - 12-26-2020, 02:23 AM
RE: WPC floor inspection - vyndr2 - 03-25-2021, 12:02 AM
RE: WPC floor inspection - vyndr2 - 06-21-2021, 02:26 AM
RE: WPC floor inspection - vyndr2 - 08-26-2021, 01:00 AM
RE: WPC floor inspection - vyndr2 - 10-31-2021, 01:16 AM
RE: WPC floor inspection - vyndr2 - 01-12-2022, 10:42 AM
RE: WPC floor inspection - vyndr2 - 02-12-2022, 07:56 AM

Forum Jump:


Users browsing this thread: 3 Guest(s)