The following warnings occurred:
Warning [2] Creating default object from empty value - Line: 11 - File: inc/plugins/tapatalk.php PHP 7.4.33 (Linux)
File Line Function
/inc/plugins/tapatalk.php 11 errorHandler->error
/inc/class_plugins.php 38 require_once
/inc/init.php 233 pluginSystem->load
/global.php 18 require_once
/showthread.php 24 require_once
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 864 - File: showthread.php PHP 7.4.33 (Linux)
File Line Function
/showthread.php 864 errorHandler->error




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Custom furniture production cycle why so long?
#1
In recent years, with the increase in consumer demand for personalized, custom products more and more popular with the people. Housing structure diverse, different sizes, consumers "difficult to tune," to the traditional furniture products raised the problem. In order to use the idle space to play the use of value,Beli pantai katil di malaysia so that Gala horns can also be distributed light, many families began to look to the custom furniture market. Custom furniture and finished furniture compared to the consumer to bring the layout of personalized, space and efficient sense of experience, so that consumers fully appreciate the "home culture" fun. But perhaps should be the old saying goes, "slow work fine", custom furniture, the production cycle is longer to some consumers to bring some trouble.
There is a difference in the length of work
In the same material, custom furniture product characteristics led to its production cycle longer than the finished furniture. Custom furniture is produced after the receipt of consumer orders,Kupon kerusi rio pantai kerusi and finished furniture manufacturers will be on the market the most common size, style, style reserves a certain amount of inventory, the production cycle will be reduced a lot. In general, the production of plate finished wardrobe in a week or so, even in the finished product on the basis of changes in the furniture, the production cycle also takes two weeks.
The Beijing Morning News reporter visited the home store in the process of understanding that custom furniture production cycle, according to product customization requirements and different materials vary. For example, custom a wardrobe, from the customer after the order to door-to-door, generally takes 30 to 45 days. And custom a solid wood wardrobe, from the production to the packaging delivery,Set meja makan yang tinggi you need 45 days or even 2 to 3 months. But the custom sofa production time is relatively short, in general, half a month can be. Strong furniture chairman Zhang Fu Choi said that the different types of customized, the required production cycle is naturally different.
Personalized customization through multiple links
Will be limited to the rational use of space, as most consumers choose the main reason for custom furniture. Size of the particularity of the requirements of the diversification of the production of furniture put forward higher requirements. Prior to the order, custom furniture and finished goods are different. Consumers to enter the store began to choose the style, materials, hardware accessories, and then determine how to price; in determining the purchase,garden furniture modern rattan bar chair and table the staff will be measured at the agreed time, and give a clear total price, and then signed a contract with the consumer, Will be signed a good contract to the factory, which entered the official order under the production.
Into the production process, custom furniture to re-make the mold, this link will take some time. At present, most of the furniture production lines are set according to the standard furniture, workers training, machinery and equipment have a scale, production efficiency and quality are relatively high, but to customize some of the different sizes of furniture, factories need to be modulated Equipment, re-cut, make a new model, which time-consuming, power will be high.
Reply


Messages In This Thread
Custom furniture production cycle why so long? - qizhenapp - 07-04-2017, 09:31 AM
Updated Product Guide - FrankJScott - 08-18-2023, 06:38 PM
Top Business Massage Info - FrankJScott - 10-06-2023, 12:19 PM
Top Rated Auto Daļas Blog - FrankJScott - 10-09-2023, 05:34 PM
New Fabric Store Info - FrankJScott - 10-24-2023, 12:49 AM
High Rated Product Guide - FrankJScott - 10-26-2023, 12:50 PM
Top Product Tips - FrankJScott - 10-26-2023, 02:54 PM
Best Product Site - FrankJScott - 10-26-2023, 03:56 PM
Useful Product Blog - FrankJScott - 11-04-2023, 12:11 AM
Useful Pink Flower Guide - FrankJScott - 11-07-2023, 06:47 PM
Top Rated Casino Website - FrankJScott - 11-14-2023, 07:20 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)